Procedure :
The Unified Rendering engine is incrementally patched on the ABAP side. When you apply the notes there will be numerous prerequisites. These prerequisites will apply one by one the changes to the ABAP engine. All the notes together will bring the system to the complete and actual stack level.
Implementing the UR notes may take time, and you need to be careful to always activate all the objects listed at the application, otherwise the UR framework can become inconsistent and syntax errors can occur in UR classes.
1. Open the SAP Note : 2090746 and search for the relevant component SAP_BASIS or SAP_UI
2. Open the UR SAP note from the table which is relevant for your SAP_BASIS or SAP_UI release.
3. Download the that relevant UR SAP Note using Transaction SNOTE
4. Upload the relevant TCI using SPAM or SAINT.
5. Now Apply the downloaded UR note to the SAP System.
Post Processing:
1. Once all the notes are applied, make sure that you delete the server and client cache
2. Run report: WDG_MAINTAIN_UR_MIMES.
3. Compare the two values labeled "urchangelist". Both must show the same number.

4. If they do not show the same value, please execute the option 'Deploy Mimes' and check if this resolves the issue.
Note:
Ensure you have full backup of the system, before applying TCI.
Minimum SPAM Version should be 70.
No comments:
Post a Comment